A miner climbs on excavated rocks after a giant drill machine broke through at the final section of the NEAT Gotthard Base Tunnel

A miner climbs on excavated rocks after a giant drill machine broke through at the final section of the NEAT Gotthard Base Tunnel

A miner climbs on excavated rocks after a giant drill machine broke through at the final section Sedrun-Faido, at the construction site of the NEAT Gotthard Base Tunnel March 23, 2011. Crossing the Alps, the world’s longest train tunnel should become operational at the end of 2016. The project consists of two parallel single track tunnels, each of a length of 57 km (35 miles). REUTERS/Arnd Wiegmann (SWITZERLAND – Tags: BUSINESS TRAVEL EMPLOYMENT IMAGES OF THE DAY)

Laisser un commentaire

Votre adresse de messagerie ne sera pas publiée. Les champs obligatoires sont indiqués avec *